This Old House (1979)

This Old House (1979) : 42x23

Dorchester Triple Decker | Finish Work Begins 30 Min.
0 0 votes

Overview

On the first floor, Tom Silva and Kevin O'Connor reinstall the upper cabinets that survived the fire. Tom teaches the apprentices to trim a window in the kitchen. HVAC contractor James Bouchard shows Richard Trethewey the plan for hot water and heating. Kevin joins Carol and her sister Willie to shop for appliances for all three levels. Mark Ferrante is tiling the first of three bathrooms.